15T/H Semi-automaticDry Mix Mortar Production Line in Zambia
Capacity: 15 ton per hour
Model: DHM2000
Lead time: 15 days
Installation: Engineer available to service machinery oversea
Installation: Engineers go to Zambia to install dry mix mortar production line and train employees to operate dry mortar mixing production line
Project: 15T/H Semi-automatic Dry Mix Mortar Production Line
Installation Site: Zambia
Time: 2015-3-10
The List of Whole Production Line
Name | Model | Qua |
Twin Shaft Paddle Mixer | DWZ2000 | 1 Set |
End Product Hopper | 2m³ | 1 Set |
Valve Packing Machine | TD-F-01 | 2 Set |
Batching Hopper | 2m³ | 1 Set |
Pulse Filter | DMC15 | 2 Sets |
Screw Conveyor | LSY219*6m | 2 Sets |
Steel Platform and Ladder | -- | -- |
Indoor Bucket Elevator | TD38/25*9.8m | 1 Set |
PLC Control Cabinet | -- | 1 Set |
Air Compressor | V-0.6/8 | 1 Set |
Raw Material Storage System | 60T | 2 Set |